During 2010 and 2011, the NWC spent much of its time planning and preparing for the implementation of a transformative programme as part of its Vision 2030 initiative โ€” a wide-ranging series of improvement projects for both water supply and wastewater.

$100B
Water supply investment
$75B
Wastewater investment
73% โ†’ 85%
Household water coverage target

The plan is aimed at moving Jamaica's direct house-to-house water supply coverage from 73% of households to 85%, boosting efficiency, service reliability, and other parameters that would enable the NWC to work toward its vision of becoming a top water services utility in the Caribbean and Latin America in terms of coverage, customer satisfaction, reliability, efficiency, compliance, and viability.

The plan has identified and costed not only the areas of need or surplus, but also the strategic initiatives to be undertaken to satisfy those unmet needs in the shortest and most efficient way possible.

Under the planned programme โ€” which includes the Jamaica Water Supply Improvement Project (JWSIP) and other projects already underway โ€” major work is undertaken in every parish, in keeping with the specific details of the assessed water supply deficits.

This page describes the original Vision 2030 planning framework from 2010โ€“2011, including a target date of 2020. For the current status of active projects, see Capital Projects and the NRW Programme.
$100B Islandwide Plan

Major Areas of Focus

The water improvement plan groups its work into five areas, covering everything from source to tap.

๐Ÿž๏ธ

Water Sources & Intake

  • Refurbishing / upgrading water production sources
  • Intake Works rehabilitation
๐Ÿญ

Treatment Plants

  • Water Treatment Plants rehabilitation
๐Ÿ”ง

Distribution Network

  • Network refurbishing to reduce technical losses and improve service level
  • Replacement of pipelines
  • Pressure zoning and improved pressure management
  • Refurbishing / replacement of water storage tanks
  • Pumping Equipment rehabilitation
๐Ÿ•ณ๏ธ

Well Rehabilitation

  • Detailed inspection
  • Well cleaning
  • Replacement of well casings / screens
๐Ÿ“ˆ

Supply Extension

  • Providing water to areas not currently served
  • Providing 85% household coverage